POP #2
       
     
Twist #11
       
     
       
     
Studio
       
     
Twist #8
       
     
Twist #9
       
     
Twist #9
       
     
Twist #9
       
     
Studio
       
     
Portal
       
     
Twist #9
       
     
Drift Series
       
     
Curl #4
       
     
Curl #4
       
     
Drift #109
       
     
Curve #10
       
     
Studio Table
       
     
Drift #24, Pop, & Curve
       
     
Pop
       
     
Curve
       
     
Pop
       
     
Untitled Commision
       
     
Untitled Commission
       
     
Untitled Commission
       
     
Wedge #1
       
     
Wedge #1
       
     
Wedge #1
       
     
Drift #19
       
     
Drift #19
       
     
Drift #19
       
     
Drift #19
       
     
Drift #19
       
     
Drift #19
       
     
Drift #19
       
     
Wave #2
       
     
Ellipse #1
       
     
Ellipse #1
       
     
Spins #2
       
     
Bump #3
       
     
POP #2
       
     
POP #2

Unmasking one of 100 pieces

January 2024

Twist #11
       
     
Twist #11

Assembling Twist #10 Pieces

April 2022

       
     
Pop #2 CNC Timelapse

Cutting out four of the 100 plywood pieces for Pop #2 painting.

April 2023

Studio
       
     
Studio

Experimenting with light projection
May 2021

Twist #8
       
     
Twist #8

Assembling Twist #7 pieces
July 2021

Twist #9
       
     
Twist #9

Preparing to paint tops of Twist #9 pieces
September 2021

Twist #9
       
     
Twist #9

Preparing to paint ends on Twist #9
August 2021

Twist #9
       
     
Twist #9

Twist #9 pieces being cut out on the ShopBot and Andrew (assistant) sanding
February 2021

Studio
       
     
Studio

Pieces waiting for assembly
June 2021

Portal
       
     
Portal

Painting rings for Portal
August 2020

Twist #9
       
     
Twist #9

Plywood and pigmented epoxy
Gluing pieces for an 8 foot version of twist
January 2021

Drift Series
       
     
Drift Series

Acrylic on plywood
Assembling laser-cut paintings
July 2020

Curl #4
       
     
Curl #4

Dry fitting pieces before gluing
January 2020

Curl #4
       
     
Curl #4

Dry fitting pieces before gluing
January 2020

Drift #109
       
     
Drift #109

Acrylic on Plywood
Assembling laser cut paintings
August 2019

Curve #10
       
     
Curve #10

Comcast commission painting
May 2018

Studio Table
       
     
Studio Table

Paints for Curve #10
May 2018

Drift #24, Pop, & Curve
       
     
Drift #24, Pop, & Curve

Gluing Drift, painting Pop, & painting Curve.
October 2014

Pop
       
     
Pop

Masked and being painted.
2014

Curve
       
     
Curve

Painting on a special "rack".
2014

Pop
       
     
Pop

Masked and being painted.
2014

Untitled Commision
       
     
Untitled Commision

Gluing together with pigmented epoxy.
2013

Untitled Commission
       
     
Untitled Commission

Sawing the wall mount angle.

2013

Untitled Commission
       
     
Untitled Commission

Checking everything before more sanding and painting.
2013

Wedge #1
       
     
Wedge #1

Test assembly before taking apart to paint.
2014

Wedge #1
       
     
Wedge #1

Partially painted.
2014

Wedge #1
       
     
Wedge #1

Painting.
2014

Drift #19
       
     
Drift #19

Laminating with pigmented epoxy.
With Bob Bickey.

Drift #19
       
     
Drift #19

Playing with pieces.
2011

Drift #19
       
     
Drift #19

Me sanding, Bob routing.

Drift #19
       
     
Drift #19

Jig for initial smoothing with a router.

2011

Drift #19
       
     
Drift #19

Pieces.

2011

Drift #19
       
     
Drift #19

Painting.

2011

Drift #19
       
     
Drift #19

Painting.

2011

Wave #2
       
     
Wave #2

Playing with pieces.

2011

Ellipse #1
       
     
Ellipse #1

Assembled.

2011

Ellipse #1
       
     
Ellipse #1

Painting

2011

Spins #2
       
     
Spins #2

Installing the motors.
Spins #2
2010

Bump #3
       
     
Bump #3

Painting